Leverage measurement while drilling and geomechanical data from the drilling phase to optimize perforation placement and final fracture design.
Supercharge hydraulic fracturing by merging drilling data and treatment overlays to enhance stage analysis, mitigate problems, and reduce pump time.
Completions teams often lack visibility into the drilling phase with valuable geomechanical and geosteering data out of reach. The Corva platform integrates drilling data and treatment overlays into your workflow to analyze stages and supercharge future completions, mitigate problems, and save on pumping time.
By leveraging Corva, a Montney operator compared stage design with actual lithology data captured in the drilling phase and made necessary treatment adjustments to optimize proppant loading, pressure, and fluids for every stage, ultimately avoiding potential screenout.
Ready to take completions to the next level? The Corva Completions platform helps you improve pumping time, boosts efficiency, and reduces completion costs. Explore our solutions or schedule a personalized demonstration now.