Optimization of Intermediate Hole Section Cuts 1.27 Days and More Than $76K in Rig Time

Optimizing ROP Performance and Reducing Costs

A Permian Basin Operator used Corva apps to analyze nearby high-performing wells with similar characteristics to improve and optimize drilling efficiency.

Optimizing ROP Performance and Reducing Costs

Utilizing Corva’s Driller’s Roadmap, Parameter Comparison, MSE and ROP Heatmaps, Days vs Depth, and Metrics apps, the Operator monitored and benchmarked performance against drilling KPIs, resulting in a cost reduction of $35,400.

LATEST UPDATES

Explore Our Other Case Studies